Thursday, December 24, 2009

Christmas Comes Early

Merry Christmas everyone! It's been awhile since I've put up a blog, largely because I was waiting for a few things that were almost done to get completely done so that I could take nice pictures of them to put on the blog. As has so often been the case, getting things that last 10% done is the hardest part. I'll catch everyone up room by room:

Bedroom:
We had just finished painting the walls of the master bedroom in the last blog entry. Shortly after that at 7:00am on a Saturday, the carpet guys showed up to carpet the bedroom. I won't even get into how unpleasant it is to be unexpectedly interrupted at 7am on a Saturday, because the big problem was that we were planning to paint the trim of the bedroom that day. Colleen, who was also sick, 'greeted' the carpet crew and thoughtfully explained to them that perhaps it would be better if they came back a few days later. They left the rolls of carpet and exited stage left. Five verification calls and three schedule changes later, they showed up again to install the carpet. Below is our new master bedroom and it is done! Well, we need to paint the doors and there is some minor touchup paint work to do, but it is ready to be moved into as soon as the bathroom is done and we don't have the threat of workers walking through our bedroom.


Bathroom:
The bathroom has had a lot of work done to it. The tile was installed and the flooring were both installed a few weeks ago. As I alluded to before though, it's the last 10% that is holding things back. Even though I sent a warning email to our project manager not once, but twice, telling him that the tile guys were going to tile over the access to the tub plumbing and motor, nothing was done. The result was that they had to cut out tiles that we had just paid to have installed. Ultimately they will have to create some kind of access panel to replace those tiles. Early this morning we saw the first attempt at that panel and it was a feeble attempt. I had a conversation with the carpenter and I think we are going to find a better solution to that little issue. Since this is Christmas, this little story has to have a happy ending. In this case, it was that the plumbing was all done! Our early Christmas present was getting to try out the tub last night. I have to say, it was pretty awesome. Our tankless hot water heater definitely did the trick and the inline water heater in the tub (it heats the water as it recirculates in the jets) is fantastic.

There are a few other things around the bathroom that still need some work. Our bathroom counter was ordered with the faucet holes in the wrong place, so that still needs to be replaced and the faucets installed. The shower enclosure needs to be done as well. The contractor for that spent all of last week and most of this week not returning our calls, so that is still in the very early stages of what will likely be a few weeks long process.
.
Greatroom:
Not much happened in the greatroom for a long time, largely because the contractors are done with that room and Colleen and I have been trying to get paint done elsewhere. Finally, Colleen got to lay down the first coat of paint in the greatroom only hours ago. We are hoping to get the walls painted over Christmas, the trim over New Years, and the floor in the weekend after that. The goal is to have the room ready for entertaining in time for our Super Bowl party. That would be a pretty simple task except for the fact that Colleen and I are headed to Europe for two weeks. Such a tough life . . .

Monday, December 7, 2009

And it was Good

One of the great understatements of all time is after God creates the first light he steps back and thinks 'this is good.' I mean, if I had just created light out of nothing I think I'd be just a little bit more excited than that. I'd be calling all my friends and saying 'Hey, you know how it's been dark since before the beginning of time and all the sudden it's light now? That was me! Isn't that awesome!"

Almost all of the remaining lights in the addition were installed today including the pendant lights over the counters. To say that Colleen and I thought the lights were 'good' would be a huge understatement (but probably not as big as God's).

We have also been able to gather the waters under heaven in one place. By which of course I mean the sink now works. Somewhat less miraculous than God's third day on the job, but an accomplishment none the less.

p.s. Happy 5 month anniversary to the Addition!

Sunday, December 6, 2009

Ups and Downs

We had a couple of good weeks there in a row, but this week was back to the more typical up and down cycle. It ended on a great note with us hosting the traditional 'Friends Thanksgiving' here on Saturday and Sunday.

The Heat is . . . On (do do do do do, do do do do do!)
Early in the week the thermostat was installed so we were blessed with heat in the entire house for the first time in a long time. Apparently the installers cranked it up and turned on the 'emergency heat' feature to make sure it was warm when we got home. Since I had also already closed some of the vents, this basically made it 85 in some parts of the house and 60 in others. Since then it has evened considerably. The air handler is also very quiet which was a bit of a concern. The programmable thermostat looks like it will be great, but it looks like it will take three hours to program correctly and we haven't yet put in the time.

That Sinking Feeling
As you may recall, our counters were installed the Tuesday before Thanksgiving and our stove and microhood have been here for months. We were really hoping that we would be able to get the plumber out here to install the faucets and the stove. Well, he did . . . sort of. The stove and dishwasher are sitting in their spots and the sink faucet was installed, but he didn't leave himself enough time to get into the crawl space to hook up the drain or the gas line, so none of it actually works yet. So close! This was especially unfortunate with the party this weekend. We put some flower arrangements in the nonworking sink to keep people from using it so at least it looked pretty.

Come Hell or No Water
Determined to host parties no matter the state of the addition, Colleen and I hosted our second 'in construction' shin-dig this weekend. The 'Friends Thanksgiving' is a lot like any other pot luck Thanksgiving get together only it's with friends instead of family. We put some cardboard and our brand new area rug down in the greatroom and used a projector to make a 104 inch screen on the wall.


Additional Accumulation
The addition saw its first snowfall this past weekend. I'll leave you with a few shots of the addition in its blanket of white.



Sunday, November 29, 2009

Paint by Numbers (Painting: Day 4)

Days: 4
Pizzas: 2
Parents Roped into Helping: 3
Beers: 15 (estimate, probably low)
Gallons of paint: 14
Square feet painted: 6160 (440 sq ft per gallon); 0.14 acres
Square feet of ceiling: 2714
Painters tape applied: 1620 feet; 0.3 miles
.
Holy crap am I tired of painting. On the bright side, we did actually accomplish all of our goals. Every surface that is going to have a light installed on it has had two coats of paint (and a coat of primer) applied to it. We actually have some significant painting yet to do, but this certainly got us most of the way to the finish line. The only thing that we still need to paint in order for the construction company to finish their work is the trim in the bedroom and bathroom which should be more of a one-two day project. The bathroom is done, the bedroom is done, the great room ceiling is done (so . . . much . . . ceiling), the closets are done. Eventually we need to finish the greatroom and repaint the stairwell and the guest room, but let's not dwell on that right now.

Saturday, November 28, 2009

Painting: Day 3

Today was productive, but not quite as productive as we had hoped. I can certainly say it was not from a lack of effort though. Here's a quick recap: the bathroom and two of four closets are completely done; the master bedroom is primed, taped, and ready for its first coat of color; the greatroom is half primed (we ran out of paint). Tomorrow the bedroom will get color and the greatroom will get two coats of ceiling paint.

Colleen's dad took the day off from painting to hunt. To fill in for him, we brought in my mom. We got quite a few pictures of her today, but none of her face. I think that's because she spent almost every minute here facing a wall putting down tape or paint. That's her on the right (guess from which side of my family I got my height).


Our electrician was here working hard for at least 8 or 9 hours and still didn't get everything done. Again though, there are some highlights: the kitchen and master bedroom are completely wired (including our awesome new ceiling fan); elsewhere all of the switches and outlets are in, but few of the lights have been installed. The lights that are installed look pretty sweet. Hopefully our electrician will be back again soon to finish up.

Friday, November 27, 2009

Painting: Day 2

What better way to celebrate with your family on Thanksgiving than by making them do manual labor? Colleen and I put together some lofty goals this weekend and to meet them all, we needed some help. The electrician is due out tomorrow to install the electrical sockets, switches, and lights. Since lights are annoying to paint around, we wanted to get as many of the ceilings painted as possible before he arrived. He'll also likely install the vanity light which means we'd like to have the bathroom painted. And in the great spirit of 'while you're at it' we decided to try to get primer up in the great room and the master bedroom. Colleen's parents have been a big help the last two days and my mom is due to show up tomorrow.

So far we're doing okay on our goals. We have at least one coat of paint on all the surfaces that lights will be installed on. The kitchen, bedroom, and bathroom ceilings are done, and we hope to have the bathroom wall and one or two of the closet ceilings done by the time the lights are installed tomorrow. See some highlights of the fun below.

With no light, painting at night involves worklights and creepy shadows.

Paul powered through the entire ceiling of the great room in one shift.

Rhema performs what has become the least favorite activity: cleaning the walls.

This was just as comfortable as it looks.

Thursday, November 26, 2009

Count(er)ing Our Blessings

Happy Thanksgiving everyone!

Before I get into the new addition news, let me just say that Colleen and I have a lot to be thankful for. Clearly we do some whining on the blog, but it would be a little boring if every blog entry was 'Things are Great!' We really are blessed just to be able to do a project like this and it has been a great adventure. Moreover, we are truly blessed because we have such great friends and family to support us (some of whom are literally helping us out right now). Okay, enough sappy stuff, let's get to the news!
.
At last update we were priming the kitchen in prep for painting. We got that all done (except the ceiling) and it looks very nice. It's a good thing we got it done too, because Tuesday was a very counter productive day. Usually that's a bad thing, but not this time. A small army of guys showed up to install our counters on Tuesday. Because we got Corian, the largest section was all one piece (a big selling point for us since it means no seams for water and germs to collect). I was at work, but Colleen got a great shot of the counter when it was still vertical.
It took them about 3 hours to install and they look great (again, please ignore the floor).


We've spent much of the last two evenings shelf papering and putting dishes in our new cabinets. It's extremely satisfying to finally be reversing the flow of stuff by taking it out of storage and putting it into the kitchen. We are doing lots more painting over the holiday weekend and quite a few things are slated for next week. We should get our appliances and sink faucets installed. I'm hopeful the thermostat will finally be installed so we can get some heat in the addition. Also, our tile is due to be 'produced' on Monday so it might arrive before the end of next week.